BIOMASS SANT JOAN DE DÉU

SANT JOAN DE DÉU HOSPITAL OF ALMACELLES

New power plant and biomass heat network at the Sant Joan de Déu Hospital of Almacelles

Nergy Global Service is in charge of the construction of a new biomass heating network for the Sant Joan de Déu hospital in Almacelles. This will provide sanitary hot water throughout the complex. The heat production is centralized with a biomass boiler with 1235kW of thermal power. In this way, the heat is distributed through pipes through the different buildings that make up the healthcare center.

Features:

  • 1235 kW production plant. 
  • It feeds practically all the buildings of the San Juan de Dios de Almacelles healthcare center. 
  • 741 Tn CO₂ / year savings.

Related projects

  • Biomass Sant Joan de Déu

    Sant Joan de Déu Hospital of Almacelles

    Button
  • <Previous

    Actual

    Next>

    Share by: