New power plant and biomass heat network at the Sant Joan de Déu Hospital of Almacelles
Nergy Global Service is in charge of the construction of a new biomass heating network for the Sant Joan de Déu hospital in Almacelles. This will provide sanitary hot water throughout the complex. The heat production is centralized with a biomass boiler with 1235kW of thermal power. In this way, the heat is distributed through pipes through the different buildings that make up the healthcare center.
Features:
1235 kW production plant.
It feeds practically all the buildings of the San Juan de Dios de Almacelles healthcare center.